A website launch checklist for a controlled go-live.

Review the visible experience, technical foundations, integrations, release responsibilities, recovery path, and early monitoring before the production switch is approved.

Readiness rules

Keep launch approval specific enough to be useful.

A checklist should reveal unresolved responsibility and risk. It should not turn a limited review into a blanket guarantee.
Baseline

Close visible launch blockers

Resolve missing content, broken paths, unusable controls, priority-device failures, incorrect metadata, and release-critical defects before approval.

Conditional

Test only the systems in scope

Forms, analytics, CRM, payments, consent tools, search, APIs, migration redirects, and CMS workflows require approved inputs and access.

Ownership

Name who can authorize and recover

Record the release owner, hosting contact, content approver, credential owner, rollback route, support boundary, and monitoring window.

Interactive launch review

Work through the complete website release path.

Ticking an item records progress in this browser only. Evidence, approvals, access, and unresolved exceptions should still be documented in the project handoff.
Browser checklist0 of 20 checks recorded

Progress stays on this device and does not replace project evidence or approval.

0 of 20
Required baselineConditional systemOwners: Shared, Client, Simpleweb, Hosting
01

Content and conversion paths

Confirm that the public website says the right thing, supports its claims, and gives visitors a dependable next step.

02

Responsive and accessibility-aware QA

Inspect the real content and controls across priority viewports, input methods, and supported browsers.

03

Search, routing, and discovery

Verify how users and crawlers reach, understand, and move between the production URLs.

04

Forms, integrations, and measurement

Treat each connected system as conditional until its data, access, failure behavior, and owner are approved.

05

Release, recovery, and early operation

Approve the production switch only after ownership, recovery, and the first monitoring window are understood.

Release sequence

Turn the checklist into an authorization record.

The sequence keeps a checked box from becoming a substitute for evidence, owner decisions, or production observation.
  1. Freeze

    Confirm the release candidate, content state, required checks, conditional systems, owners, launch window, and known dependencies.

    Output: Release-candidate record
  2. Verify

    Run the relevant browser, device, content, routing, metadata, integration, hosting, and recovery checks against the approved build.

    Output: QA evidence and exceptions
  3. Authorize

    Record who accepts the release state, which issues block launch, which are deferred, and who can execute or reverse the production switch.

    Output: Go-live authorization
  4. Observe

    Recheck priority journeys, forms, redirects, errors, analytics requirements, and production behavior during the agreed monitoring window.

    Output: Post-launch observation log

Launch questions

Use the checklist without turning it into a guarantee.

Prepare the release

Make launch conditions visible before production becomes the test environment.

Share the current site, target domain, content state, forms, integrations, analytics requirements, hosting owner, redirect needs, launch window, and recovery constraints.